Toggle navigation
联系我们
泽尼特集团
关于我们
better together(共赢未来)
使命
价值观
历史
销售办事处
泽尼特意大利
泽尼特欧洲
泽尼特泵业(中国)有限公司
泽尼特亚太
生产基地
泽尼特意大利
泽尼特泵业(中国)有限公司
新闻
业绩
历史案例
产品
潜水电泵
家用/住宅水泵
专业/工业领域水泵
污水提升装置
家用/住宅污水提升装置
专业/工业领域污水提升装置
曝气系统
曝气器
潜水曝气机
搅拌系统
搅拌机
推流器
附件
水力附件
电器和电动附件
搜索潜水电泵
根据您的需求使用简便的筛选项挑选出最适合您的水泵。
水泵选型软件
用Zeno Navigator选型软件挑选最佳尺寸和配置的水泵
应用领域
家庭领域
工业领域
民用领域
水处理领域
农业领域
应用
工具
联系我们
搜寻:
USA
中文
EN
FR
DE
IT
RU
ES
泽尼特账户
泽尼特账户
电子邮件
请输入您的电子邮件
密码:
保持连接
还没注册?现在注册吧!
忘记密码
Home
工具
Zeno Navigator 学院
Technical Videos
UNIQA
Maintenance Videos
Zeno学院
Better Together
您的浏览器不支持视频标签。请更新您的浏览器或系统。
泽尼特集团
|
29 3月 2018
UNIQA - ZUG V
湿式版本组装 - 完整的泽尼特涡流式叶轮带冷却夹套和高压机械密封湿式版本的 UNIQA (ZUG V) 系列高性能潜水泵的机械密封拆卸和换油程序。
Step by step operations
Fit the O-ring into place on the flange and grease
Fit the flange onto the shaft, with a suitable driver
Secure the flange with the snap ring, making sure it is perfectly snug
Wet the counterface with alcohol and fit it, using a suitable driver
Blow with compressed air to remove all traces of dirt and lubricate the counterface
Clean the surfaces of the seal with a paper towel
Wet the seal in alcohol and fit it onto the shaft, using a suitable driver
Fix the seal with the snap ring
Fit the shim ring on the rotating side
Fit the casing onto the shaft and tighten the fixing stud bolts, securing them with Loctite 243 threadlocker
Grease the O-ring and fit it into place on the rotating side
Fit the seal onto the shaft, paying attention to the positions of the locator slots
Wet the counterface with alcohol and fit it into place in the pump plate, using a suitable driver
Fit the counterface locking ring and fit the screws without fully tightening them. Use Loctite 243 threadlocker
Fit the O-ring into its seat
Fit the oil cage and tighten the counterface locking ring screws
Fold the wings of the oil cage inward, taking care that they do not interfere with rotation of the seal
Fit the O-ring into the seat in the pump plate
Blow with compressed air to remove all traces of dirt and lubricate the counterface
Fit the O-rings into the oil chamber screw seats
Fit the pump plate onto the oil chamber and fix it with the screws
Tighten at least two opposite screws by hand to fit it gradually into position.
Fit a cap into one oil chamber hole and a compressed air fitting into the other
Pour in a little alcohol to check for leaks
Test for tightness at a maximum pressure of 1 bar
Remove the cap and fitting
Grease the V-ring and fit it onto the shaft
Screw a male eye-bolt onto the shaft and lift the motor with a hoist
Refit the handle so that the cable will not be crushed when handling the motor
Lay the motor part horizontal on the workbench with the oil chamber caps upward
Tighten the handle screws
Fill the chamber with oil. Refer to the documentation for the correct amount
Seal the oil chamber with the caps
Place the impeller on a firm support and connect it to the drive shaft
Secure the impeller with the fixing screw. Use Loctite 270 threadlocker
Spray the pump plate O-ring with spray lubricant
With a hoist, lift the motor by the handle and connect it to the pump body
Fix the pump body with the screws
您仅被授权浏览该视频的预览短片。
您可在菜单栏点击
注册
账户后观看完整视频。
Share this page on:
与泽尼特保持联络
泽尼特新闻
泽尼特集团
|
16 十一月 2023
Zenit Group has achieved "FM Approvals" certification.
搜索更多 ›
参考
泽尼特集团
|
14 三月 2024
Oxidation process with Jetoxy
搜索更多 ›
历史案例
泽尼特集团
|
18 一月 2024
Zenit Group cuts logistics and production costs on exhibition pumps thanks to additive printing technology.
搜索更多 ›
Zeno学院
泽尼特集团
|
19 五月 2022
pumpBOX - Installation procedure
搜索更多 ›
点击查看所有
产品系列
潜水电泵
不锈钢系列
潜水电泵
Blue系列
潜水电泵
BluePRO系列
潜水电泵
UNIQA系列
潜水电泵
UNIQA系列
高性能潜水切割泵
Grey系列
潜水电泵
特种材质系列
潜水电泵
污水提升装置
BlueBox
污水提升装置
nano
BOX
污水提升装置
BoxPRO
一体化预制式泵站
曝气系统
Oxyplate
盘式曝气器
Oxytube
管式曝气器
Oxyinox
不锈钢曝气器
Jetoxy
潜水曝气系统
搅拌系统
ZM系列
高性能潜水搅拌系统
PR
系列推流器
附件
耦合装置
底座
冲洗阀
止回阀与闸阀
弯头组件
法兰和吊链
浮球开关
控制系统
Zeno Navigator选型软件套组
登陆Zeno选型软件
Zeno Pump Selector
Zeno Spare Parts
Zeno学院