Situation
Faced with an increasingly serious problem with sewage outflow for 1,056 households, the Puning Community at Chengde called us in to find an effective drainage solution. Time was of the essence: the pumping station had to go into operation within one month.
Solution
Using the Zenit BoxGRP pumping station and with the cooperation and coordination of the local authorities, the project was successfully completed, including all lifting pump connections, installation and testing, within the one-month deadline.
Benefits
Breaking with traditional pumping station construction methods, BoxGRP simplifies installation and cuts construction times. The customised service satisfies users' various needs, pipeline design is optimised and the efficient pumps extend the pumping station's lifetime.
The customer is confident that when fully operational the pumping station will provide an effective, lasting solution to its sewage drainage problem.
Lifting the BoxGRP
Installing the BoxGRP
Unloading the pump